- Home
- Services
- PRODUCTS
- PRODUCTS / back
- Portable
- Residential
- Commercial
- Industrial
- Automatic Transfer Switches
- Service Areas
- About
- ABOUT / back
- Local Offices
- Our History
- Financing
- Contact
Generator needs stepper motor and a valve adjustment completed.
The generator is still under warranty. Start up 2/3/2021 Generator needs the mag pick up and assembly replaced.
Recommend replacing block heater and 5/8ths diameter heater hoses upper and lower on block heater due to heater not shutting off after heating block to proper temperature and heater hoses leaking coolant.
1X PMA APPLIED ADDITIONAL $25.00 TO UPGRADE TO A 1X SERVICE AGREEMENT. 11/02
Arrived to do P.M., upon initial inspection fond controller not illuminated. After performing tests, found the controller not responding. Recommend replacement.
Fill out the form and we reach out to schedule your Free On-Site Consultation.